Laserfiche WebLink
Site Plan No. SPC -10 Project <br /> 24. Submit to the Public Works Department a grading and storm <br /> drainage plan for review and approval prior to issuance of <br /> building permit. Off-street parking surface drainage shall <br /> be as follows: Minimum cross-slope on asphalt concrete is 2% <br /> or concrete is 1% with a maximum of 5%. Concrete valley or <br /> curb gutters shall have a minimum slope of 0 .25%. <br /> 25 . Driveway entrance onto Moffat Boulevard shall be defined with <br /> pavement improvements, including signing and pavement <br /> markings to be approved by the Public Works Department. <br /> 26 . All work within the street right-of-way shall conform to the <br /> City of Manteca Standards Plans and shall require an <br /> encroachment permit from the Public Works Department. <br /> 27 . Prior to construction activity on projects five acres or more <br /> in size, the Developer shall meet the requirements of the <br /> National Pollution Discharge Elimination System, administered <br /> by the California State Water Resources Control Board. For <br /> permit information, contact the Board at: <br /> State water Resources Control Board <br /> Division of Water quality P.O. Box 1977 <br /> Sacramento, CA 95812-1977 <br /> Attn: Storm water Permitting Section <br /> Page of <br />