Laserfiche WebLink
East Stockton Transfer and Recycling Station Modification Traffic Assessment <br /> ' September 19, 2011 <br /> Page 5 <br /> 1 import truck traffic will occur between 1:00 p.m. and 2:00 p.m. The peak hour for export truck <br /> traffic will occur between 5:00 p.m. and 6:00 p.m. The maximum number of truck trip ends <br /> ' projected in any hour is 40 trucks and occurs twice, between 7:00 and 8:00 a.m. and between <br /> 9:00 and 10:00 a.m. During those two hours a truck either arrives or departs on average once <br /> every 90 seconds (40 trucks per hour). <br /> TABLE 2 <br /> HOURLY TRUCK DISTRIBUTION* <br /> Hour Import Trip ends Export Trip Ends Total Trip <br /> 1 Ends <br /> Percentage No.of Percentage No.of <br /> Trucks Trucks <br /> 5:00—6:00 a.m. 3% 8 6% 9 17 <br /> 6:00—7:00 a.m. 2% 5 4% 6 11 <br /> 7:00—8:00 a.m. 9% 23 11% 17 40 <br /> 8:00—9:00 a.m. 8% 20 8% 12 32 <br /> 9:00— 10:00 a.m. 12% 31 6% 9 40 <br /> 10:00— 11:00 a.m. 9% 23 0% 0 23 <br /> 11:00 a.m.— 12:00 p.m. 5% 13 3% 5 18 <br /> 12:00 p.m.— 1:00 p.m. 9% 23 0% 0 23 <br /> 1:00—2:00 p.m. 14% 36 2% 3 39 <br /> 2:00—3:00 p.m. 11% 28 0% 0 28 <br /> 3:00—4:00 p.m. 9% 23 2% 3 26 <br /> ' 4:00—5:00 p.m. 9% 23 9% 14 37 <br /> 5:00—6:00 p.m. 0% 0 17% 26 26 <br /> ' 6:00—7:00 p.m. 0% 0 14% 22 22 <br /> 7:00—8:00 p.m. 0% 0 9% 14 14 <br /> 8:00—9:00 p.m. 0% 0 9% 14 14 <br /> Total Trucks 256 154 1 410 <br /> * Truck percentages from Pacific Waste Consulting Group document"Information about Truck Use for East Stockton <br /> Recycling Facility",SJVAPCD,CEQA Ref#20100208,January 11,2011 <br /> Table 3 presents a breakdown by vehicle type of the two peak hours of truck traffic. During the <br /> 7:00 to 8:00 hour it is projected that there will be 15 debris box trip ends and 17 export transfer <br /> truck trip ends, while in the 9:00 to 10:00 a.m. hour there will be 11 collection truck, 15 debris <br /> truck trip ends and 11 export transfer truck trip ends. <br /> The site is laid out with debris box unloading occurring in the "C&D" Material Processing area <br /> in the northeast corner of the site. It is expected that eight debris box trucks can be unloading at <br /> ' any one time. The collection trucks are expected to unload inside the processing building; 3 <br /> collection trucks are projected to be able to unload simultaneously. One import transfer truck <br /> will also unloading and one export transfer truck will be inside the processing building at any <br />