Laserfiche WebLink
KL EINF-,EL DER <br /> 'right people.Right Solutio- <br /> (2) Describe project phasing (location/timing): There is no project <br /> phasing. <br /> (3) Days/Hours of operation: The plant will operate 24 hours a day, <br /> seven days a week. <br /> Work shifts per day: 2 <br /> (4) Total number of employees: 50; Number of employees per <br /> work shift: 25 <br /> 5) Number of company vehicles/trucks: None <br /> (6) Estimated number of vehicle trip ends (TE) per day generated by <br /> project: Trucks 410 TE/Day; Passenger Vehicles, 150 TE/Day; <br /> Total, 560 TE/Day. <br /> (7) Estimated maximum number of TE/Day based on proposed <br /> General Plan Designation: N/A TE/Day, and/or Proposed Zoning: <br /> N/A TE/Day <br /> (8) Will land use-related noise produced on site exceed adopted <br /> noise standards (i.e.: 45 Leq dB during nighttime or 55 Leq dB <br /> during daytime hours at nearest residential property line; 75 <br /> Lmax dB at nearest commercial property line; and/or 80 Lmax <br /> dB at nearest industrial property line)? <br /> Yes No If yes, describe sources and levels of noise: <br /> Yes. See Section (C) 11 Noise. <br /> (9) Other operational or design characteristics: None <br /> b. Describe Proposed Residential Land Uses: [Check or specify <br /> applicable types] <br /> The proposed project does not involve any residential uses. A residential <br /> neighborhood is located south of the project site, separated from this site <br /> by Weber Avenue and scattered industrial light uses. <br /> B. PROJECT SITE CHARACTERISTICS (Completed by Applicant an /or Lead <br /> Agency, as applicable): <br /> 1. Total Site Acreage (Ac.) (or) Square Footage (S.F.): 6.28 Ac. <br /> 121339/STO11R226 3-4 October 14, 2011 <br /> Copyright 2011 Kleinfelder <br />