Laserfiche WebLink
N <br />storage area. The sewage expansion area is equal to the size of your proposed <br />septic tank area (Appendix D). Also refer to the Final EIR. <br />10. Maintain adequate records of your Hazardous Waste Load Checking Program. <br />Written records of all random load inspections should be maintained onsite <br />(14CCR Section 17258.20). <br />11. Describe how yard waste will be handled. <br />12. Provide a clean closure plan for the excavated landfill on the newly acquired <br />property as indicated in the Final EIR. This plan may be separate from the RSI. <br />The Lovelace Transfer Station solid waste facility application is considered complete. <br />If you have aW,questions please call Ed Padilla, REHS at 468-3458. <br />k6urie Cotulla, Program Manager <br />Environmental Health Division <br />cc: Jon Whitehall, CIWMB <br />Robert Evans, RWQCB <br />