Laserfiche WebLink
v_IA�FAcs_n4m_F <br />M, =h 26, 2001 <br />To: j County of San Joaquin <br />of Public Warts <br />:�ttciinon Fu is Baker <br />i <br />i <br />Job Location: <br />i <br />SCOPE OF WORIL. <br />"go <br />Zurich and cap axing 8" sewer Line at bob directions as required, repave with 6" asphalt , <br />Total Qaote ....... —---------------- -----52,109.04 <br />TERMS OF QUOTE: Ma progress payment due by the 1e of each exceeding month with baUnce due widfm 30 days of completion <br />of otzr Portion of d wozl A service charge of I V% per month v4I be charged on nit past due accaarrts. <br />Ex LU3tONs ro QQO?E: <br />I. ! We ere not mgxmNe fcc mage to our work by onsite coimactors. <br />We 8r fees for and inspections, removal ofrelocation ofuttlmes i¢regt&ed). <br />costs of bonds, pem its or p== fees, erosion coutroL parsnsnent paving strpmg and cowete. <br />3 ' In the evert d Mr h=rdom or toxic Wastes are encourztered. the cast shaft be borne by the developed owner. <br />4. i If 141for=cM mWagromd strucftes ere CMUntef4 that cannot be removed with orftary hard toots, the aemor l of said <br />ShUOMM shaD proceedon a costs basis. <br />AH excess crut wM be Jeff on site. <br />C ; Proposal is VAM for, 15 days Arora above date. - <br />AMALTERATION OR DEVIATTONFROM THE ABOVE 1NV0LV}NG m crRA COSTS vAM BE E MCUTED UPON VMMM3 OR <br />VMUIAL.ORDERS AND VML BECOME AN E MA CHARGE OVFR nM SUM MMnONFD IN THIS PROPOSAL. <br />i <br />RESPECTFULLY Rmh T!'ED, <br />HAROLD CRLM31F ELD <br />CRU3TCHFIELD CONSTRUCTION CO. <br />