Laserfiche WebLink
C <br />2.6.2 Commercial Route <br />The refuse collectors use the "commercial" lane and stop at the "commercial" scale. They are <br />weighed loaded before proceeding to the Commercial Disposal Area. After unloading they leave <br />the station using the west exit. No additional weighing is necessary since the tare weight of these <br />vehicles is recorded in the computer system. When new vehicles are put in service, they must <br />return to the "commercial" scale and be weighed empty to obtain the tare weight. <br />Other occasional users of the Commercial Disposal Area may include vehicles from the general <br />public with large loads, as directed by the attendant, as well as the overflow of "public" vehicles <br />during weekend peak hours. <br />2.6.3 Transfer Route <br />The transfer trailers will use the "transfer" lane and proceed to the Transfer Tunnel for loading. <br />They are weighed at the "transfer" scale and leave the station using the west exit. <br />2.6.4 Recycling Route <br />The general public with loads of recyclable materials that have been separated at the source will <br />stop at the "public" gate and then proceed to the Recycling Drop -Off Area for unloading. <br />The vehicles that transport the recyclable materials to market are the only "non-public" vehicles <br />allowed to use the "public" lanes. These vehicles stop at the "public" gate for identification and <br />then proceed to the recycling areas for loading. They are weighed in the Recycling Area before <br />leaving the station using the east exit. <br />2.7 CONSTRUCTION PHASING <br />Construction of the new facility will be phased to allow for uninterrupted operation of the <br />existing facility and a smooth transition after the new facility is completed. <br />The following is a schematic construction sequence: <br />2.7.1 Phase 1 <br />Construction of Transfer Building, Recycling Area, Retention Pond, Fuel Station, and roadways <br />west of the existing station. Construction of Scale House, scale pits, and new entrance road <br />north of the existing station. Temporary enlargement of existing drainage pond. <br />HE <br />