Laserfiche WebLink
2.7.2 Phase 2 <br />Construction of entrance road in segments and use of temporary detours, as follows: <br />- Construction of the two new "public" lanes in the vicinity of the existing entrance road. <br />Opening of the new station using temporarily the two new "public" lanes for all traffic. <br />Removal of existing scale and scale house. Construction of remainder of "transfer" and <br />'°commercial" lanes. <br />2.7.3 Phase 3 <br />Demolition of existing station. Installation of remainder of utility lines. Filling of existing <br />drainage pond and existing transfer pit. Construction of Office/Maintenance Building, <br />Employee/Visitor Parking, Recycling Drop -Off, and Transfer Trailer Parking. Construction of <br />remainder of roadways and paved areas. <br />Source: "Feasibility Report for the Proposed Renovation and Expansion of the <br />Lovelace Road Transfer Station, San Joaquin County, California"; <br />Prepared for San Joaquin County Department of Public Works by Bissel <br />& Karn in association with Kleinfelder, Inc.; November 1991. <br />A-9 <br />