Laserfiche WebLink
. 1 <br /> CLEAN CLOSURE <br /> (Continued) <br /> Board _staff have developed a guideline for <br /> defining the minimum components for a clean <br /> closure plan. The following should not be <br /> construed as regulations_. The minimum <br /> components of a clean closure plan should <br /> include, but are not limited to: <br /> • Site Characterization, <br /> • Excavation and Material Management, <br /> • • Confirmation of Waste and Degraded <br /> Material Removal, and <br /> • Postclosure Maintenance and Land Use <br /> Revised 12/1/92 <br />