Laserfiche WebLink
Limit noise-generating construction activities to the hours of 7:00 am. to 5:00 <br /> p.m., Monday through Friday. <br /> Locate fixed or portable noise sources, such as air compressors and concrete <br /> Pumpers, as far as Possible from the property line. <br /> Equip all internal combustion engine-driven equipment with mufflers that are in <br /> good condition. <br /> G. BIOTICS <br /> (1) POTENTIALLY SIGNIFICANT IMPACT: PRESENCE OF SQUIRRELS. RATS, AND <br /> FLIES <br /> Due to the nature of solid waste handling activities, squirrels, rats, and flies are <br /> attracted to the existing facirdy. This activity is currently conducted in an open <br /> area without benefit of a controlled environment. The proposed expansion <br /> project will bring the solid waste handling operation into an enclosed building for <br /> which vector controls can be established. <br /> Fndinos• <br /> Changes or alterations have been required in, or incorporated into, the project <br /> which avoid or substantially lessen the significant environmental effect as <br /> identified in the Final EIR. <br /> Statement of Fact: <br /> The Impact will be reduced by the following: <br /> Confine the waste handling operation to the Transfer Building. All doors, <br /> windows,and inscreened openings should remain closed unless actually in use. <br /> Provide pest control services around the perimeter of the building as necessary. <br /> H. 'LIGHT AND GLARE <br /> (1) PgT_e_MALLY SIGNIFICANT IMPACT, ,-. LIGHT AND GLARE ON NEARBY <br /> REBID QM&PROPERTIES <br /> Although the vw=W faciety is not wqxx;tW to operate during nighttime hours, <br /> it is likely to utilize rKjhWV for security purposes. In addition, area righting may <br /> be utilized in Me outdoor recycling area and transfer trailer parking area. <br /> Findincr. <br /> Changes or alterations have been required in, or incorporated into, the project <br /> which avoid or sibstandally lesson dw significant environmental effect as <br /> idendfied in the Fhal EIR. The midgatim measure Is Wed below. <br /> Attachment A -a - UP-93-2 <br />