Laserfiche WebLink
DRAFT <br /> • The site's storm drainage system, which would include an underground drain replacing the <br /> existing surface drain on the abandoned portion of Pershing Avenue and the capacity of the <br /> site's stormwater detention pond to handle any increased surface runoff resulting from the <br /> project, would have to meet the standards of the City's Municipal Utilities Department. <br /> Stockton Scavenger Transfer Station Expansion 9 ESA/990190 <br /> Preliminary—Subject to Revision(October 18,1999) <br />