Laserfiche WebLink
w � <br /> 7. Other permits/revi uired by the City, County, State, FeWl and/or oribraInnfor project <br /> implementation: See attached table. <br /> e <br /> Agency: Permits/Reviews: <br /> 8. Describe any proposed General Plan amendments and/or prezoning/rezoning requests: See attached table <br /> General Plan Desi ng ations Acres Zoning Districts Acres <br /> to to <br /> to to <br /> 9. Describe any site alterations which result from the proposed project(specifically address the amount and <br /> location of grading, cuts and fills, vegetation removal, alterations to drainage, removal of existing structures, <br /> number of trees removed, etc.) <br /> Cutting and grading required for the below-grade roadway past the loadout area <br /> (10% grade down, 8% grade up). A paved driveway across the currently unpaved <br /> storage area west of Pershing Avenue will increase impervious surface on the <br /> site but would not otherwise alter drainage. A drain will connect green waste <br /> ad,to exis in d,ai age s st <br /> 10. Sppecafic ProtectDesriptton/$ ratio�nal� 'aracteristics: <br /> a. Describe proposed Commercial, Industrial and Institutional uses (includes recreational and other non- <br /> residential uses):(See the Project Description of. the EIR for more information.) <br /> Receipt of non-hazardous commercial, industrial, and residential municipal <br /> solid waste and green waste for the purposes of materials recovery and <br /> transfer of wastes to landfill S isposalS te. Structure Required Panang <br /> (1) E!mgosed Land Use(s) pin AQMM Sg• Ft. Earking ELgvided <br /> Industrial M-2 11 1 <br /> 1. Includes portions of public ways to be abandoned prior to pro_ect <br /> Totals: implementation. <br /> (2) Describe project phasing (location/timing): Construction to began December 1999 ®r <br /> January 2000 and to be completed within three or four months. <br /> (3) Hours of operation: Monday-Saturday 4 am to 5 12M Sunday 8 am to 4 Dm <br /> (4) Number of employees/work shifts: _87 / 1 principal shift (office staff (11) on <br /> (5) Number of company vehicles/trucks: 60 different schedule from rest o TS staff; <br /> ** (6) Estimated number of vehicle trip ends (TE) per day generated by proposed project <br /> Truck Trips—2_04 TE/Day;Passenger Vehicles 200 TE/Day;Total 1104 Day <br /> *(7) Estimated maximum number of TE/Day based on proposed General Plan Designation: <br /> TE/Day and/or Proposed Zoning TE/Day <br /> *These will be evaluated in the EIR. <br /> ** .Vehicle TE estimates subject o revision; will be evaluated in the SEIR <br />