Laserfiche WebLink
(8) Will noise produced by proposed or allowed land uses exceed adopted no standards(i. .:45 <br /> hourly Leq, dBA during nighttime hours at nearest residential property line; 75 dB Ldn/CNEL at <br /> nearest commercial property line; and/or 80 dB Ldn/CNEL at nearest industrial property.line)? <br /> Yes No Describe any incorporated mitigation measures: This will be analyzed <br /> (9) Other operational or design characteristics: in the EIR. <br /> b. Describe Proposed Residential Land Uses (check as applicable): Conventional 1-F, 2-F or 3-F <br /> URD , Condominiums , Apartments . Dormitory/Lodging/Rooming/Boarding <br /> Ho es . Elderly Housing . Mobile Homes , Motel/Hotel ,Other <br /> (1) Eidential Land US2 Su ma : Maximum Maximum <br /> Site Proposed Net Allowable Net <br /> Tvto n' !Z in egg Units Density Units Qgnsb <br /> Totals: \ <br /> (2) Describe Project Phasing (locati\ming): <br /> (3) Population Projection for Proposed Project\ <br /> For Maximum Density <br /> (4) Projected Total Student Generation for Proposed Project: <br /> For Maximum Density <br /> (5) Estimated total number of vehicle trip ends(TE) per day generated by proposed project <br /> TE/Day <br /> (6) Estimated maximum number of vehicle trip ends (TE)per day base <br /> %onoposed General Plan <br /> designation: TE/Day; and/or proposed zoning Iay <br /> 11. Will the project generate any substantial short-term and/or long-term air quality impacts, including <br /> regional/cumulative contributions? Yes No Maybe Y Air quality impacts will be <br /> If so, describe the impacts and mitigation measures: analyzed in the EIR. <br /> a. Construction Emissions/Mitigation: Standard construction mitigations (such as watering) <br /> should mitigate construction emissions. <br /> b. Stationary Source Emissions/Mitigation: Emissions from grinding operations will be_ <br /> analyzed in the EIR. <br /> C. Mobile Source Emissions/Mitigation: Mobile emissions could be substantial, if distant <br /> landfills are used in the future. <br /> d. Will the project require review and/or permitting by the San Joaquin Valley Air Pollution Control District? <br /> Yes X No Authority to Construct and Permit to Operate may be <br /> required for tub grinder and other equipment. <br /> 3 <br />