Laserfiche WebLink
t. Additional information concerning the design and operation of the facility shall be furnished upon request and within the time frame <br />specified by the LEA. <br />u. The maximum permitted daily tonnage for this facility is 1,800 tons per day, and shall not receive more than this amount without <br />a revision of this permit. <br />v. The proposed bio -mass operation shall process wood waste as described in the TPR. <br />w. This facility shall not exceed the maximum daily traffic count of 1,245 trips per day without revision this permit. <br />x. Food waste shall not exceed more than 15% of the co -composted elongated windrows and shall not exceed more than 40% of the <br />material composed in the enclosed or aerated static piles. <br />y. A copy of this permit shall be maintained at the facility. <br />z. A noise study shall be required in the event that complaints are received by the LEA regarding the noise generated by the facility <br />operations. The noise study would need to be conducted within 180 days of the first verified complaints. <br />aa. The LEA must be notified in writing 7 days in advance of non -routine changes in operations at this facility. <br />Page 5 of 5 <br />