Laserfiche WebLink
Construction &Demolition/Inert Debris Facility Report <br /> Tracy Material Recovery Facility and Transfer Station <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> Table 4 - Inert (Type A) Inert Processing Design Capacity <br /> Machinery/ Machinery Permit Ave. Max. <br /> Production Gate Production Design <br /> Rate Tonnage Hours/Day Capacity <br /> Portable HSI Lippeman up to <br /> Milwaukee Jaw Plant, 250 200 8 3,000 <br /> 3- deck Cedar Rapid Tons/Hour Tons/Day Hours/Day Tons/Day <br /> screen, electric (or <br /> similar <br /> The facility is proposed to receive up to 400 TPD of mixed C&D debris. Mixed <br /> C&D debris varies in consistency. Tracy MRF & TS plans to recycle the inerts, <br /> wood, metal, cardboard, plastics, carpet padding, carpet, dry-wall, and C&D fines <br /> with the rest considered as residual, for a minimum 60% recycling rate. On a <br /> typical peak day, the facility would be able to process 100 TPD of wood, 100 <br /> TPD of metal, 65 TPD of inerts, 30 TPD of cardboard, 20 TPD of plastics, 5 TPD <br /> of carpet and padding, 10 TPD of dry-wall, 70 TPD of MRF fines and 100 TPD of <br /> residual (as the estimated composition of materials, or a combination thereof). As <br /> Table 5 demonstrates below, the design processing capacity is capable of <br /> handling in excess of the planned 400 TPD capacity over the 12 hour work day. <br /> When mixed loads have a variable C&D debris consistency, the CD Processing <br /> Facility has adequate design capacity to process the debris. <br /> Table 5 — CD Processing Design Capacity <br /> C&D Processing Production Production Max. <br /> method Rate Hours/Day Design Capacity <br /> C&D Debris Pre- 15 Tons/Hour 16 240 TPD <br /> Sort Load Out hours/da <br /> Mixed C&D 30 Tons/Hour 16 480 TPD <br /> Processing Line hours/da - <br /> Total 45 Tons/Hour 16 720 TPD design <br /> hours/day 400 TPD proposed <br /> Table 6 — Material Processing Design Capacity <br /> Machinery Machinery Average Ave. Max. <br /> Production Gate Production Design <br /> Rate Tonnage Re uired/Day Capacity <br /> Inert Crushing 250 80 .32 3,000 <br /> Tons/Hour Tons/Da Hours/Da Tons/Da <br /> Residual Load-out 60 100 1.67 720 <br /> Tons/Hour Tons/Day Hours/Day Tons/Day <br /> 7 170.18 CDI FacReport 02121313 <br />