Laserfiche WebLink
Transfer/Processing Report <br />Tracy Material Recovery and Transfer Facility <br />30703 S. MaoWhur Drive, Tracy, <br />, Callfomja 95377 <br />4--- Table 10 <br />Peak Loading <br />Waste Type <br />Activity <br />Tons Per Day <br />(TPD) <br />Throughput <br />MSW <br />Transfer <br />Recyclables <br />Processing <br />Green Waste and Food Waste <br />&D/Inert Debris <br />Total Facility Throughput <br />Transfer/Processing <br />1,800 TPD peak <br />If existing staff and equipment working within the posted operating hours is not <br />sufficient to transfer incoming material, the vehicles will be routed to another <br />recovery or disposal facility. <br />St9fl4tY_E9qtmgnt Essential equipment is purchased only from vendors who <br />can supply spare parts or repair parts within 24 hours of a request for such items. <br />The most critical on-site equipment is the front-end loader. Front-end loaders can <br />be rented at nearby equipment rental yards should the equipment not be able to <br />be repaired in a timely manner. <br />18221.6Q) description of transfer, recovery and processing equipment, <br />including classification, capacity and the number of units <br />Tracy has adequate equipment in type, capacity and number, and sufficiently <br />maintained to allow the facility. <br />The following equipment used at the facility are shown in Table 11 below: <br />45 <br />