Laserfiche WebLink
Report of Composting Site Information <br /> Tracy Material Recovery Facility and Transfer Station <br /> 30703 S. MacAurthur Drive, Tracy, Ca. 95377 <br /> ® • Screening - Ground materials are screened into various sizes depending on the <br /> product to be produced. Contaminants are removed. <br /> • Wood Products - Various products such as mulch, landscape chips, and co- <br /> generation fuel are stored or shipped off-site. <br /> • Windrowing - Some of the ground materials are placed in windrows for <br /> composting. The rapid decomposition phase of the process will take <br /> approximately 12 weeks. The curing phase of the composting process will take <br /> approximately 8 weeks. <br /> • Aerated Static Pile - Some of the ground materials, particularly those with food <br /> waste content greater than 20%, are placed in aerated static piles for <br /> composting. <br /> • Screening - Finished compost will be screened based on the product to be <br /> produced. <br /> • Storage - Finished compost products are moved to a storage area or shipped off- <br /> site. <br /> Material Processing and Load Checking <br /> When a truck enters the facility, it is weighed and the organic material is unloaded from <br /> the trailer. The facility's scale personnel are trained to screen incoming vehicles for <br /> presence of unacceptable wastes. This applies to those wastes delivered by <br /> commercial haulers, governmental agencies, self-haulers or landscapers. <br /> The composting facility personnel training programs will include instruction in methods <br /> to observe incoming loads and to check for the receipt of unacceptable materials. The <br /> key employees include the scale personnel, composting facility load check personnel, <br /> equipment operators, and the site manager. <br /> All loads will be checked and ground prior to loading the feedstock into the mixing <br /> equipment. Physical damage to equipment, which can occur from inert debris, such as <br /> concrete, metal rebar, and engine parts, is too great to ignore and affects production of <br /> a quality product. The Local Enforcement Agency will be notified of the identification, <br /> segregation, acceptance and disposition of any serious unlawful delivery of hazardous <br /> materials identified through this load check program. Any such items shall be handled <br /> and disposed of by trained personnel in accordance with applicable law and regulation. <br /> Hazardous Waste Exclusion Program <br /> Only non-hazardous organic wastes are accepted at the site. The greatest likelihood of <br /> hidden hazardous waste being in the waste stream would occur in loads of post- <br /> consumer food wastes from restaurants or mixed with yard wastes. All incoming <br /> material will be checked following the load-checking program previously described. <br /> 19 <br />