My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 11:17:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report of Composting Site Information <br /> Tracy Material Recovery Facility and Transfer Station <br /> 30703 S.MacAurthur Drive, Tracy, Ca. 95377 <br /> The finished product will then be stored on-site for not more than 180 days until the <br /> product is shipped off to market. There is adequate room on-site to store the finished <br /> product for extended periods. The Site Plan provides capacity totaling 68,700 cubic <br /> yards of total compost material. <br /> G. DESCRIPTION OF COMPOST EQUIPMENT USED AT THE FACILITY <br /> INCLUDING TYPE, CAPACITY, AND NUMBER OF UNITS <br /> Equipment used at the facility for current and future operations is shown in Table 4. <br /> Table 4. Processing Equipment <br /> Equipment Used in Methods Type Qty. <br /> Front end loader 1, 2 & 3 Major Brand 2 <br /> Grinder 1, 2 & 3 Major Brand 1 <br /> Trommel screen 1, 2 & 3 Major Brand 1 <br /> Trommel screen 1, 2 & 3 Major Brand 1 <br /> Trommel screen 1, 2 & 3 Major Brand 1 <br /> Windrow Turner 1 & 2 Scarab 1 <br /> H. ANTICIPATED ANNUAL OPERATION CAPACITY FOR THE FACILITY IN <br /> CUBIC YARDS <br /> It is anticipated that the facility will process up to 115,000 cubic yards of material per <br /> year through the facility. Factors that influence throughput consist of adequate, <br /> appropriate feedstock, material bulk density and moisture content, availability of new or <br /> additional feedstock sources, and market demand. There is on-site capacity for 56,000 <br /> cubic yards of active compost, curing compost, feedstock, additives and ground <br /> material. <br /> I. DESCRIPTION OF PROVISIONS TO HANDLE UNUSUAL PEAK LOADING <br /> The equipment and personnel scheduled to be located at the facility are expected to <br /> handle any anticipated peak loading. Additional equipment availability to manage a <br /> peak-loading situation is detailed in Table 4. Employee rotation, absence due to illness <br /> or vacation, have been factored into personnel requirements to allow for peak loading <br /> conditions. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.