Laserfiche WebLink
Item No. 2 <br /> 1` PC: 12-16-93 <br /> —' <br /> ER-93-1/UP-93-4 <br /> I Page 6 <br /> the wood and yard waste processing arid composting area, and all refuse tipping,'sorting and <br /> processing will take place within the 30-foot-deep excavated pit. <br /> There are two primary types of land uses in the area surrounding the project site, gravel mining <br /> and agriculture. Lone Star Industries operates a sand and gravel mining facility west of the site, <br /> with Teichert Aggregates operating a similar facility to the north. Directly across MacArthur Drive <br /> to the east are orchards and a field presumably used for row crops. The.property to the south <br /> of the site is vacant agricultural land. Other'land uses in the area include-fields of row crops and <br /> the Royster Tire Storage and Recycling facility to the west The Banta-Carbona Irrigation District <br /> canal runs along the western boundary of the site. Corral Hollow Creek is also located north of <br /> the site. <br /> There are few residences in the project area. The closest are the two mobile homes located <br /> across MacArthur Drive,approximately 600 feet northeast of the site. There is also one residence <br /> approximately 1.4 miles south of the she on the west side of MacArthur Drive. There are also <br /> scattered residences at the intersection of Urine Road and MacArthur Drive, north of the site. <br /> The Final ETR concluded that the project is not likely to create land use conflicts with surrounding <br /> i. uses; either agricultural,residential, or resource extraction. The project will be enclosed with a <br /> six4 t-high chain-link,fence and.landscaped along MacArthur Drive. Also, except for the wood <br /> and yard waste processing and composting,all other operations will take place inside the transfer <br /> station building. This,.combined with the project's location in the bottom of the 30-toot-deep pre, <br /> 4 will minimize land use conflicts. <br /> Property owners in the area were mailed notices of Draft EIR availability, as well as project <br /> referrals. No comments from neighbors were received on the Draft EIR, ar�O no comments <br /> regarding the Draft EIR were made by the one neighboring property owner present at the hearing <br /> on the Draft EIR. <br /> Traffic <br /> /Circulation: <br /> The Final EIR prepared for the project did not identify any significant traffic related impacts. The <br /> proposed project is expected to generate approximately 500 daily trips initially and approximately <br /> 1,100 daily trips in 2010. Since the trips will likely be dispersed over an entire day, according to <br /> the FEIR there is little relative impact to other users of the local transportation system. <br /> FACILITIES/SERVICES: <br /> Drainage: <br /> Storm water nmoff from all areas except the wood storage and yard.waste composting area will <br /> drain to an on-site retention pond. Storm water runoff from the wood storage.and yard waste <br /> compost area will drain to an on-site lined evaporation pond. Water used for periodic wash down <br /> i of the transfer station floor will be collected and directed to holding tanks for temporary storage <br /> l until pumped out and hauled off the site for disposal. <br /> J <br />