Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 7 <br /> HAZARDS/CONSTRAINTS: <br /> Flo°dinp• <br /> Although the site is not within a flood hazard zone,there is the potential for Corral H <br /> located north of the site, to overtop and spill into the site. Hollow Creek, <br /> potentially significant impact and suggested The Final EIR identified this as a <br /> a 100-year'.24-hour flood in Corral Hollow Creek from accidentalgation that ly OverflowingSt <br /> into rms be con theo Prevent <br /> Condition of Approval,the applicant wilt be required to prepare an analysis of Corral Hollow Creek <br /> for a 100-year, 24-hour-flood.event. Berming shall be constructed if it is determined by the <br /> analysis to be necessary to protect the site. <br /> Hazardous Waste: <br /> The facility Will be available for periodic household hazardous waste events sponsored <br /> by <br /> Joaquin County. Any hazardous materials-discovered in the waste stream will be temporarily <br /> stored in a hazardous waste locker until disposed of off the site. The facility will accept 1@c clable <br /> household hazardous materials such as used oil; lead acid batteries, and antifreeze. These <br /> materials will be labeled,stored at the site in special-bins and containers, and transported off the <br /> site by-dealers in these commodities. <br /> As required by the California Integrated Waste Management Board,a load screeningprogram <br /> be implemented at the transfer station. The facility will also not accept any hazardous commercial ` <br /> or industrial waste. P g am will <br /> ENVIRONMENTAL CONSIDERATIONS: <br /> All of the issues identified and analyzed in the EIR can be mitigated to less than significant levels. <br /> Therefore, a 'Statement of Overriding Consideration'will not be required to take action on the ro'ect. <br /> Attachment A includes the findings necessary to certify the Final EIR as adequate. Attachment B contain <br /> the*Findings of Significant Environmental Impact,•and Attachment Cis the Mitigation Monitoring Pro ram. <br /> 9 <br />