Laserfiche WebLink
• s' <br /> 1.. <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 15 <br /> Finding: <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental .effect as identified in the Final <br /> mitigation measures are listed below. EIR. These <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> • If necessary, as determined by the.Airport Land Use Commission after operations begin, <br /> bird netting, a noise system, or other means to ward off birds shall be installed. <br /> B. VEGETATION AND WILDLIFE RESOURCES <br /> 8.1: Potentially Si III cal Im act-. Potential direct mortaC of the San Joa uin kit fox Burin <br /> construction and arouriii disturbino`activities. <br /> Fin_ ding: , <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identTed in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> ° Not more than 60 days prior to construction, a professional biologist retained by the <br /> applicant shall conduct a preconstruction survey of the site for the presence of the San <br /> Joaquin kit fox. If any kit foxes are found, precautions specified in Chapter 4.2, Condition <br /> 4.2-4, of the Final EIR shall be taken. <br /> B.2. Potential) Si nificant lm act: Potential disturbance to bre adina or wintering burrowin owls. <br /> Finding: • <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> Not more than 60 days prior to construction, a professional biologist retained by the C <br /> applicant shall conduct a preconstruction survey of the site for the presence of burrowing <br /> owls. If any owls are found, precautions specified in Chapter 4.2, Condition 4.2-6, of the <br /> Final EIR shall be taken. <br />