My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIL <br /> Item No. 2 <br /> J <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 16 <br /> C. GEOLOGY/GEOTECHNICAL <br /> C.1. Potentially Significant Impact: The proposed project would expose workers and project facilities <br /> to seismic hazards. <br /> Finding:. <br /> Changes or alterations have been required in, or,incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of'Fact: <br /> This impact will be reduced by the following: <br /> • Seismic design shall be in accordance with the Uniform Building Code (Seismic Zone 4), <br /> as specified in the project geotechnical report contained in Appendix F of the Final EIR. <br /> C.2 Potentially Significant Impact: Excavated and fill slopes at therp oposed project site could <br /> potentially fail, causing iniury, damage to facilities. or buryinq solid waste material. <br /> Findjn <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> • All new cuts and fills shall be consistent with the geotechnical recommendations <br /> contained in Appendix F of the Final EIR. In areas where slopes are steeper than 2:1,-the <br /> following mitigation measure shall be implemented: regrade slopes to 2:1 or flatter, or set <br /> back all improvements at least 30 feet from the top and bottom of slopes, or erect <br /> landslide debris barriers. <br /> C.3. Potentially Significant Impact: Existing surface soils are inadequate to support foundations for the <br /> proposed project facilities. <br /> Finding: <br /> Changes or alterations have bee"ri required in, or incorporated into, the project which avoid or <br /> s substantially lessen the.significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.