Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 <br /> ER-9,3-1/Up-.q3-4 E <br /> 1 Page 19 <br /> • Litter shall be picked up regularly on the site, on surroundin <br /> approach to the facility, 9 properties, and along the <br /> D.4. Potentially SMinificant Impact- Accidental overflow of flood waters from Corral Hollow Creek into <br /> the reclaim eii ravel it could create a safe hazard or cause substantial dama a to the <br /> o eraffons or result in the tr a'nsl2ort of contaminants,from''the ro-ect site to downstream areas <br /> or into round water. Althou h unlike to occur runff of contaminants from the ro'ect site into <br /> ComaI Hollow Creek m adverse *fm act a vatic habitat and o ulations of existin s ecies <br /> or runoff may impalr other beneficial uses downstream <br /> Finding:- <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> • The applicant shall prepare an analysis of Corral Hollow Creek for a 24-hour, 100-year <br /> storm event. If necessary, berming shall be constructed to protect the site. <br /> E AIR QUALITY <br /> E.1. Potentially Significant Impact: Construction activities such as clearing excavation and grading <br /> operations,-construction vehicle traffic and wind blowing over exposed earth would generate <br /> exhaust emissions and fugitive particulate matter emission <br /> Finding <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> `t substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> Prepare a PM10 Dust Prevention and Control Plan that includes the dust control <br /> measures specified in Chapter 4.7, Condition 4.7-1, of the Final EIR. <br /> E.2 <br /> sources.Potentially Signficant Impact: The transfer station would create a number of potential odor <br /> ._ <br /> Findin <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br />