My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_2013_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:42 PM
Creation date
7/3/2020 11:17:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_1
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0505006_30703 S MACARTHUR_2013_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 2 <br /> PC: 12-16-93 <br /> — <br /> ER-93-1/UP-93-4 <br /> Page 1 S <br /> • Liquids,leached from the received wastes and washdown water.*used for periodic <br /> washdown of the transfer.station floor shall be-tiirected into holding tanks or lined <br /> evaporation ponds. <br /> • Areas containing equipment shall be-curbed to contain petroleum products and hydraulic <br /> leaks. Truck washing areas shall be equipped with trench drains to collect waste water. <br /> D.2. Potentially Significant Impact: Degradation or impairment of ground water resources may result <br /> from contamination entering the_ground water sysfem over the life of the project as a result of the <br /> lack or failure of impervious surfaces and liners In working areas Contamination of a public water <br /> supply could occur. <br /> Finding: <br /> Changes or alterafions have been required in, or incorporated into, the project which avoid or. <br /> substantially lessen the significant environmental effect as identified in the Final:EIR. <br /> - Statement of Fact: <br /> This impact will be reduced by the following: <br /> • Mitigation measures detailed above for mitigating surface water impacts will also provide <br /> mitigation for ground water impacts. <br /> • Personnel working with the°load screening program'and on the'tipping floor'shall have <br /> 40 hours of OSHA training on spill containment, personal protective equipment, and the <br /> handling of recyclable household hazardous materials. <br /> • An approved hazardous materials storage area shall be provided at the facility for storage <br /> of hazardous wastes discovered as a result of load screening and processing: <br /> D.3. Potentially Significant Impact: Project operations may result in an adverse impact to artificial water <br /> carrying structures, in particular the Banta-Carbona Irrigation Canal. <br /> Finding: <br /> Changes or alterations have been required in, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EIR. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> • Erosion control measures shall be implemented as detailed above to minimize soil loss <br /> and sedimentation during construction. <br /> • Unpaved roads and working surfaces shall be watered frequently to minimize dust. <br />
The URL can be used to link to this page
Your browser does not support the video tag.