Laserfiche WebLink
AMENDED MANURE MANAGEMENT PLAN FOR HIGH-RISE BUILDINGS <br /> SEPTEMBER 6, 1996 <br /> (1) In dry months,twice a week manure will be removed from the poultry houses, <br /> conventional methods of "Thin-Spread" manure drying will be used. Manure <br /> will be piled up, then the dried manure will be removed to Mr. Martin or to <br /> other farmers for crop or tree producers as a fertilizer and always removed <br /> before seven (7) days. <br /> (2) In wet months, ponds A, B, and C may be used for manure disposal, areation <br /> will apply to insure no fly breeding or odor. A ramp will be built to make sure <br /> manure drops into pond water and is submerged. <br /> (3) High-rise building #1, #2, and #3 will have cement floors for easier cleaning <br /> before the new layers are placed in the units. <br /> (4) Ponds A, B, and C must maintain an adequate free board area during <br /> operation. The high rise units were not designed for ponds, thus if a <br /> nuisance occurs in ponds, the manure must be diverted to alternative <br /> disposal methods. <br /> SEP - 7 1995 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES I ' <br /> S301/12�3S/11W�13d' <br /> H11b3H 1111N3WN0a/AN3 vo/S/"l/ <br /> 3331/1& <br /> 33�&17 b3N b <br /> 5661 _ ^ tiq�s � 1N3wN� <br /> °��� ,�3H D/�aO d/,A <br /> Qn V S661 Z - d�SNb`c <br /> JI <br /> ����-4 trd <br />