Laserfiche WebLink
Manure Management Plan <br /> Kleinfeld Egg Farm 1993 Page 2 of 2 <br /> 2. In Buildings #1, 2, 6,7, 13 & 14, manure will be biological remeidiated <br /> as basicaly in the Environmental Houses #17, 18 & 19 (Refer to Section <br /> 1). <br /> A. Manure will be removed from the designated buildings as weather <br /> permits. Dry manure from thes houses will be used on contracted <br /> farmer's property as needed. (Refer to Section 11, #11). <br /> 3. In dry months, manure will be thin-spread on the eight (8) acres south <br /> of Building 6 & 7. Manure will be removed every seven (7) days to Mr. <br /> Martin and Mr. Taro's properties. No maoUre drying of any type will be <br /> allowed on the vacant area east of Mr. Swanson's Ostrich Farm. <br /> 4. Ponds #A, B, & C will not be used for manure disposal at this time. <br /> Storm water will drain to the natural lay of the land, as it has been doing <br /> doing for many years to the S/W corner of the property. <br /> FUTURE PLANS QE BILL HUANG EGG FARM <br /> A. Mr. Huang and Mr. Martin are looking at a pipeline, in the near <br /> future, equiped with a pump to direct liquid manure to a large <br /> lagoon for irrigating his farmland. <br /> B. Additional new high-rise houses is another possibility that would <br /> eliminate the conventional chicken manure practices of wet <br /> manurg. <br /> C. Mr. Huang is looking at new technology in feeding additives to <br /> laying birds in order to eliminate fly breeding concerns in houses <br /> or in fields to land. <br /> 111. The above Manure Management Plan is only as reliable as the Management of <br /> Mr. Huang and the signed contracts with Mr. Martin, Mr. Taro, and Mr. Henslee <br /> of whom have contracted to remove manure off site for fertilizer for crop <br /> production. <br /> 1. Should any of the Manure Management plan contract participants <br /> decide to terminate, an amended Manure Management plan will be <br /> necessary. <br />