Laserfiche WebLink
III. Composting Facility Operations <br /> If the composting facility is to be located on a closed landfill, any impacts to the <br /> closed landfill caused by the facility operation shall be described. These impacts <br /> may include increased settlement of waste, impacts to environmental control facili- <br /> ties, and traffic impacts. <br /> Forward does not plan to locate the Compost Facility on a closed landfill. Forward oper- <br /> ates a landfill on land north of the South Fork. Approximately 1,000 feet north of Forward <br /> landfill is a municipal Class III landfill operated by the City of Stockton. <br /> A. Introduction <br /> Include a descriptive statement of the operations conducted at the facility. Include <br /> planned hours of operation and how facility design will accommodate planned hours <br /> X14 CCR 18220(c)J. <br /> The Compost Facility will use various methods of composting. A detailed operating de- <br /> scription is listed in the Materials Handling and Processing Operations sections of this <br /> RCSI. The landfill, RRF, and compost facility will operate between the hours of <br /> 6:00 a.m. to 6:00 p.m. Monday through Saturday. During the week, the RRF accepts <br /> materials up until 4:00 p.m. in order to process, clean up, or both, before 6:00 p.m. If <br /> necessary, the schedule may be extended to accommodate the disposal needs of the haulers. <br /> The site is closed on Sundays and four holidays per year (New Year's Day, Easter, July <br /> 4th, and Christmas). The business hours for the company office (in Stockton) are from <br /> 8:00 a.m. to 5:00 p.m. Monday through Friday. <br /> B. Facility Personnel <br /> i 1. Availability <br /> All employees are placed on a 6-month review period ("probation") at hire. The onsite <br /> personnel (including employees currently under review) consists of: <br /> 1 Operations manager <br /> 1 Wood grinder leadperson <br /> 2 General laborers and equipment operators <br /> 1 Secretary/office trailer attendant (part-time) <br /> Temporaries as needed <br /> The revised operations and waste stream will have no immediate effect on the number of <br /> onsite personnel. Additional personnel will be added on an as-needed basis when, and if, <br /> a demand arises. Exact numbers of additional personnel are not known at this time. <br /> aea10029M.wp5/50 <br /> 9/29/94 50 <br />