My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:09 PM
Creation date
7/3/2020 11:19:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_1994.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Composting Facility Operations <br /> If the composting facility is to be located on a closed landfill, any impacts to the <br /> closed landfill caused by the facility operation shall be described. These impacts <br /> may include increased settlement of waste, impacts to environmental control facili- <br /> ties, and traffic impacts. <br /> Forward does not plan to locate the Compost Facility on a closed landfill. Forward oper- <br /> ates a landfill on land north of the South Fork. Approximately 1,000 feet north of Forward <br /> landfill is a municipal Class III landfill operated by the City of Stockton. <br /> A. Introduction <br /> Include a descriptive statement of the operations conducted at the facility. Include <br /> planned hours of operation and how facility design will accommodate planned hours <br /> X14 CCR 18220(c)J. <br /> The Compost Facility will use various methods of composting. A detailed operating de- <br /> scription is listed in the Materials Handling and Processing Operations sections of this <br /> RCSI. The landfill, RRF, and compost facility will operate between the hours of <br /> 6:00 a.m. to 6:00 p.m. Monday through Saturday. During the week, the RRF accepts <br /> materials up until 4:00 p.m. in order to process, clean up, or both, before 6:00 p.m. If <br /> necessary, the schedule may be extended to accommodate the disposal needs of the haulers. <br /> The site is closed on Sundays and four holidays per year (New Year's Day, Easter, July <br /> 4th, and Christmas). The business hours for the company office (in Stockton) are from <br /> 8:00 a.m. to 5:00 p.m. Monday through Friday. <br /> B. Facility Personnel <br /> i 1. Availability <br /> All employees are placed on a 6-month review period ("probation") at hire. The onsite <br /> personnel (including employees currently under review) consists of: <br /> 1 Operations manager <br /> 1 Wood grinder leadperson <br /> 2 General laborers and equipment operators <br /> 1 Secretary/office trailer attendant (part-time) <br /> Temporaries as needed <br /> The revised operations and waste stream will have no immediate effect on the number of <br /> onsite personnel. Additional personnel will be added on an as-needed basis when, and if, <br /> a demand arises. Exact numbers of additional personnel are not known at this time. <br /> aea10029M.wp5/50 <br /> 9/29/94 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.