My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 11:24:49 AM
Creation date
7/3/2020 11:19:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 DOCUMENTATION <br /> The quality assurance plan depends on thorough monitoring and documentation of all construction <br /> activities. Therefore, the QA/QC Manager will document that all quality assurance requirements <br /> have been addressed and satisfied.Documentation will consist of daily record keeping,testing and <br /> installation reports,non-conformance reports(if necessary),progress reports,photographic records, <br /> design and specification revisions,and a construction report.Report forms are to be provided by the <br /> QA/QC Consultant. <br /> 6.1 Daily Record Keeping <br /> At a minimum, daily records will consist of a daily record of construction progress, daily <br /> construction report, observation and test data sheets, and, as needed, non-conformance/corrective <br /> measure reports. All forms will have peer review. <br /> 6.1.1 Daily Record of Construction Progress <br /> The daily field report will summarize ongoing construction and discussions with the Contractor and <br /> will be prepared by the QA/QC Manager and QA/QC Inspectors. At a minimum, the report will <br /> include the following: <br /> • Date,project name,project number, and location <br /> • A unique number for cross-referencing and document control. <br /> • Weather data <br /> • A description of all ongoing construction for the day. <br /> • An inventory of equipment utilized by the Contractor. <br /> • Items of discussion and names of parties involved in discussions. <br /> • A brief description of tests and observations, identified as passing of failing, or, in the <br /> event of failure, a retest. <br /> • Areas of non-conformance/corrective actions,if any,(non-conformance/corrective action <br /> form to be attached). <br /> • Summary of materials received and quality documentation. <br /> • Follow-up information on previously reported problems or deficiencies. <br /> Page 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.