Laserfiche WebLink
peak leak signal plus noise signal to background noise ratio R=(S+N)BN <br /> for each of the recorded data lines. The measured leak signals must have <br /> • characteristics of a leak. Wild data points that deviate from the theoretical <br /> leak signals shall not be used to determine R. <br /> 5. The two farthest lateral lines of data with an R value greater than 3.0 shall <br /> be noted. The average of the lateral distance from the leak for these two <br /> lines is defined to be the leak detection distance for the artificial leak <br /> 6. If unfavorable site conditions prevent obtaining an R ratio of 3.0 from being <br /> obtained, the leak location equipment shall be demonstrated to be able to <br /> detect an artificial leak from a smaller distance no less than 1 foot to verify <br /> that the leak location equipment is operational. <br /> PART 3 LEAK LOCATION SURVEY <br /> 3.1 PREPARATION <br /> A. The EARTHWORK CONTRACTOR shall uniformly wet the bare geomembrane <br /> with an equivalent of 0.2-inches of water prior to the leak location survey <br /> B. The EARTHWORK CONTRACTOR shall uniformly wet the granular drainage <br /> material to field capacity. <br /> C. The GEOSYNTHETICS CONTRACTOR shall terminate the edge of <br /> geomembrane so that it is electrically isolated from earth ground. This requires <br /> • leaving the geomembrane bare around a narrow strip around the perimeter of the <br /> geomembrane test area. <br /> D. The CONTRACTOR'S shall assist the Leak Location Contractor with other <br /> preparations that may be necessary to meet the performance requirements of the <br /> leak location survey. <br /> 3.2 LEAK SURVEY <br /> A. The leak location data shall be taken: <br /> 1. With a uniform measurement density of greater than one measurement every <br /> 10 square feet, or <br /> 2. On survey lines spaced no further apart than twice the leak detection distance <br /> determined for the artificial leak as discussed in Part 2. The measurement <br /> electrode spacing shall be no less than that used for the performance <br /> demonstration. The spacing between measurements shall be no more than that <br /> used for the performance demonstration. <br /> B. The data shall be recorded, plotted, and analyzed for leak signals. The positions <br /> of these leak signals shall be located and the leaks excavated. The leaks shall be <br /> repaired in accordance with the specified requirements for HDPE geomembrane. <br /> C. Following the repair, the leak location survey shall be repeated on the two closest <br /> survey lines for a distance extending 20 feet before and beyond the leak. If <br /> another leak signal is detected, the entire repair and resurvey process shall be <br /> repeated until no additional leaks are detected. <br /> 3.3 REPORTING <br /> COMPOST FACILITY STORMWATER IMPROVEMENTS ATTACHMENT A <br /> 2 LEAK LOCATION TESTING <br />