Laserfiche WebLink
A. The daily results of the leak location survey shall be reported to the QA/QC <br /> CONSULTANT. <br /> B. A report documenting the electrical leak location survey shall be submitted within <br /> 7 days of the completion of each leak survey. The report shall document the <br /> methodology used, the locations and descriptions of the leaks, and a figure of the <br /> WMU showing the approximate leak locations. <br /> END OF ATTACHMENT A <br /> COMPOST FACILITY STORMWATER IMPROVEMENTS ATTACHMENT A <br /> 3 LEAK LOCATION TESTING <br />