Laserfiche WebLink
• <br /> For asbestos, a strict Asbestos-Containing Materials(ACM)handling program will be <br /> developed,and will include the following: <br /> (a) Bagged ACM will be dumped only onto the working face of the asbestos disposal area <br /> and not onto the flat compacted landfill surface.*Bulldozers will then push soil cover onto <br /> the working face to cover the ACM bags and will not contact the bags. <br /> (b) For Forward site employees engaged in handling asbestos materials, Forward will <br /> Implement one of the following: <br /> • a three day approved asbestos workers training program <br /> • any asbestos training program specific to landfill employees that has been <br /> developed,described,or required by regulation by either the CfMlB or Cal-OSHA <br /> • any other asbestos training program approved by Cat-OSHA <br /> (c) Provision of water at the working face to keep ACM damp until covered. <br /> Continuation of the annual physical evaluations of an on-site Forward employees for asbestos <br /> exposure. <br /> Workers will not be allowed to eat near the active landfill. <br /> C. 32 Austin 1994(L1.0,Austin 2000(L1.0 <br /> • Working clothes should be left behind at the landfill and cleaned by the operator; <br /> Changing areas should be provided at the project site so that workers do not cavy material <br /> off-site,and <br /> Dust accumulated on non-washable items should be removed by vacuuming, not brushing or <br /> blowing. <br /> d. 33(E.2) <br /> Proposed as Part of the Project: <br /> The Forward Landfill load-checking program,"which is designed to m"rtigate against <br /> hazardous waste being placed in the landfill,will continue to be implemented for the <br /> consolidated landfill. <br /> Landfill operators will be trained to recognize and properly segregate and handle hazardous. <br /> waste. This will include a 24-hour hazardous waste materials management training program <br /> that complies with 29 CFR,Section 1910. <br /> e. 34(E.3) <br /> Proposed as Part of the Project: <br /> The Standard Safe Work Practices fisted In the Forward,Inc.Site Health and Safety Program <br /> and Contingency Plan will be implemented by the operator. <br /> The landfill operator Y411 comply with the provisions of CCR Title 27,Section 20590,which <br /> requires that O&M personnel wear and use approved safety equipment for personal heath <br /> and safety. <br /> Landfill access will continue to be controlled to limit unauthorized entry by persons or <br /> vehicles. <br /> San Joaquin County UP-00-7, ER-00-21Forward, Inc. <br /> Community Development Page 8 <br />