Laserfiche WebLink
The landfill operator will comply with all provkslons of CCR,Title 27,Division 2, Chapter 3, <br /> Subchapter 4,Afticies 1-3,"Disposal Site Operations"that apply to landfill health and safety. <br /> f. 35(E.4) <br /> Proposed as Part of the Project: <br /> Where required by State and Federal regulatioris,the landfill gas monitoring,gas control and <br /> collection system will be Installed, extending to the new areas of the expanding landfill and <br /> operating In conformance with applicable regulations. <br /> The landfill operator will not construct or otherwise locate any structure in an area of known <br /> landfill gas build-up. <br /> All site personnel who work In permanent structures will be trained to use and respond to the <br /> landfill gas monitoring and alarm system. <br /> Identified in EIR: <br /> Landfill gas monitoring shall include volatile organic compounds in order to determine the <br /> amount of contaminant recovery,and contrd potential exposure to on site personnel. <br /> g. 37(E.6) <br /> Proposed as Part of the Project: <br /> The landfill operator will follow legally required daily or alternative cover practices. <br /> The landfill will continue to ban intact tires(which collect water and serve as a breeding <br /> ground for vectors)and large dead animals from disposal at the landfiil. <br /> Existing measures to discourage birds from the landfrft will be continued. <br /> Appropriate landfill personnel will periodically monitor the landfill for the presence of vectors, <br /> and landfill inspections will be documented in the landfill operations administrative file. <br /> h. 38(E.7) <br /> Identified In EIR: <br /> (a) All applicable regulatory guidance odgf iaft after the Forward Landfill 1993 EIR and <br /> Austin Road Landfill 2000 EIR shall be Impkaented;all hazardous materials shall be <br /> handled In accordance with local,State,and federal regulations. <br /> (b) The site HMMP,SWPPP,Operations Manual,and Wet Weather Plan shall serve to <br /> provide guidance In the use and handling of hazardous materials during the operations of the <br /> fatality. <br /> 1. 39(E.8) <br /> Identified in EIR: <br /> Forward Landfill shall continue to test all krrown water supply wells within the area of the <br /> mapped and projected groundwater plume_ Groundwater monitoring test shall be performed <br /> quarterly at all downgradient private wells at risk. Where detectable VOCs have historically <br /> been reported, bottled water shall continue to be supplied by the applicant(as Is currently <br /> being done for two affected households) untfi the well sample analytical results show no <br /> detectable VOCs for four consecutive quarterly sampling events. Other offsite private wells <br /> such as the CYA wells that have not been adversely affected by the plume shall continue to <br /> be monitored and If VOC-contamination is resorted then replacement water shall be provided <br /> by the applicant,if requested. For wells within the footprint of the plume,Institutional controls <br /> San Joaquin County UP-00-7,ER-00 2ftiward, Inc. <br /> Community Development Page 9 <br />