Laserfiche WebLink
slopes will be directed to cant'runoff to areas where erosion and sedimentation can be <br /> controlled. Truck beds will be hosed down to reduce soil spillage on paved roads and wind- <br /> blown dust. Relocation of Littlejohns Creek could lessen the sedimentation potential to the <br /> creek. <br /> Completed cells will be stabilized by the planting and maintenance of drought-resistant <br /> grasses. This will inhibit wind and water erosion and maximize the fertility of the soil in order <br /> to facilitate revegetation. " <br /> Temporary plantings,geofabric drapes,and erosion-preventing diversions of surface water <br /> will be constructed as appropriate on temporary slopes. <br /> Regular operational and post-closure monitoring of erosion control structures and"plantings <br /> will be done for a minimum of five years. <br /> n. 69 Forward 4993(B.6) <br /> Assessment of groundwater levels In monitoring wells shall be initiated within 24 hours <br /> following an earthquake event having a Modified Mercalli Intensity of V or greater at the <br /> • landfill. This will allow the water level database to be adjusted or seismic variations. In the <br /> event that anomalous water level changes are noted, a series of water quality sampling and <br /> testing events shall be initiated by the applicant in cooeination with the RWQCB to detect an <br /> changes In water quality that may signify subsurface adjustments in landfill cells. <br /> o. 60 Forward 4993(B.6) <br /> Benchmarks shall be established(these could utilize monitoring well top of casing <br /> elevations), which will allow for determinations of settlemenrl oonsolidation of rill materials in <br /> closed sections of the landfill on an annual basis and following significant selsmlc events <br /> (Modified Mercalll Scale of V or above). In the event that changes are noted,the cause <br /> should be determined as should the effect on leachate-collection and recovery systems. <br /> Repair liners and LCRS as necessary. In addition,remedial spading should be accomplished <br /> to restore the original cap's function to repel water and direct surface runoff <br /> p. 66 Austin 2000(F9.a) <br /> A 4.3-acre detention basin wilt be constructed In the southwest comer of the project site,as <br /> depicted on the project plans(Beck 9993). <br /> q. 81 (1.4) <br /> Proposed as Part of the Project: <br /> If leachate is delivered to the City of Stockton Regional Wastewater Control Facility,the <br /> project sponsor will provide for independently corroborated test results to the City to <br /> demonstrate the chemical composition of the leachate extracted from the proposed <br /> consolidated landfill project. Monitoring and testing of landfill-generated leachate will meet <br /> the requirements of the City of Stockton Wastewater Ordinance and the City Municipal <br /> Utilities Department. <br /> If leachate quality Is not acceptable for disposal at the Regional Wastewater Control Facility, <br /> the project sponsor will either have the leachate collected and disposed off-site by a licensed <br /> Treatment and Disposal Facility,or will develop on-site leachate processing that will result In <br /> treated leachate that is acceptable for disposal at the wastewater treatment plant or <br /> acceptable to regulatory agencies for on-site use. The design and operation of any on-site <br /> leachate processing that Is implemented will comply with all applicable taws and regulations. <br /> San Joaquin County UP-00-7,ER-00-21Forward,Inc. <br /> Community Development Page 18 <br />