Laserfiche WebLink
r <br /> occurs. The conditions of the active faces of a landfill, as well as fthe leachate generated, <br /> must be monitored and professional judgment utilized at all times to keep these two factors in <br /> balance. <br /> g. 98 Forward 9993(D2) <br /> Portions of the site that either have been filled to the extent allowed or are not expected to be <br /> worked for extended periods(six months orionger)shall be sown with fast-germinating <br /> drought-tolerant grass seed and watered until a cover of vegetation Is established. <br /> h. 99 Austin 9994(G9.b),Austin 2000(G9.b)(similar) <br /> The project sponsor shall seek to minimize the extent of area exposed to wind erosion. <br /> Exposed surfaces,including stockpiles, shall be vegetated to the extent possible. <br /> h 20 Austin 9994(G9.c),Austin 2000(G1 c) <br /> Plan and phase construction and closure operations such that they do not take place <br /> simultaneously on dry windy days Schedule particularly dusty ages on separate days. <br /> J. 29 Austin 9994(GIA),Austin 2000(GI-CO <br /> Design the site filling plan to facilitate screening of the active face from the prevailing winds, <br /> whenever possible,to minimize the amount of windblown dust released from the working <br /> face. <br /> k. 22 Austin 9994(G1.e),Austin 2000(G9.e) <br /> Haul trucks carrying easily alrbome material shall be covered during transport and sprayed <br /> with water prior to dumping If it is shown that this would reduce dust emissions during off- <br /> loading activities within the landfill. <br /> L 23 Austin 9994(GM),Austin 2000(GM) <br /> The landfill operator shall restrict truck and equipment travel over loose, uncompacted, <br /> unpaved surfaces. <br /> m. 24 Forward 9993(D5) <br /> A particulate/meteorologlcal monitoring station should be Installed on the project site, <br /> preferably near the site boundary with one of the closer residential receptors This monitoring <br /> station should be operational for a minimum of six months during Me dry season(April <br /> September)before landfill activity begins to Intensify as a result of,project implementation. <br /> Data should be collected daily during this baseline period,during Me-Landfill's transition to <br /> higher project-related activity levels,and during the landfill's peak operational phases <br /> thereafter if the more intensive landfill operations are found to hxxement the 24-hour <br /> average of the annual average PM1O levels by more than 5 ug4n3 over baseline, <br /> respectively, even with the Implementation of all the above-mentioned dust controls, further <br /> dust control measure and/or limits on the amount of waste received at the site may be <br /> necessary to control PM90 Impacts. <br /> n. 25 Forward 9993(D6) <br /> Forward, Inc.shall schedule regular deliveries of waste at the landW to minimize queuing and <br /> Idling. <br /> o. 26 Austin 9994(Mb),Austin 2000(G2.b) <br /> The idling of all internal combustion equipment shall be limited to ten minutes at any given <br /> time. <br /> San Joaquin County UP-00-7, ER400-2\Forward, Inc. <br /> Community Development Page 20 <br />