Laserfiche WebLink
• f. 76 Austin 2000(F16.a) <br /> The project sponsors or the SJMSCP JPA should fund and conduct pre-construction protocol <br /> surveys for burrowing owls In all ruderal and non-native grassland habitats wffhfn the project <br /> site. Surveys should be conducted as recommended In the Staff Report on Burrowing owl <br /> Mitigation(CDFG 1995)and as otherwise prescribed In the Bun'owtng owl Survey Protocol <br /> and Mitigation Guidelines(BOC 1993). If burrowing owl are observed during surveys,the <br /> extent of burrowing owl habitat on the project site would be delineated by a qualfked <br /> ornithologist. Avoidance and mfffgation would be pursuant to new guidelines provided by <br /> CDFG andlor as specified by the SJMSCP. <br /> g. 77 Austin 2000(F15.c) <br /> (Burrowing owls)If the project sponsor elects to mitigate in accordarxe with the SJMSCP, <br /> then the JPA may fund and conduct pre-construction surveys to prevent direct take of <br /> Individuals or nests. Pre-construction surveys should be conducted w&hln 30 days prior to <br /> ground disturbance. These actions would reduce any significant adverse Impacts to <br /> bun-owing owl to a level considered less than significant. This mitigation option would also <br /> reduce impacts to this species habitat to a level considered less than significant by including <br /> pre-construction surveys in combination with payment of SJMSCP fees. In addition,methods <br /> to prevent occupation of the site by burrowing owls during construction should be employed, <br /> consistent with the guidelines in the SJMSCP. These methods include Installation of one- <br /> way doors in occupied burrows,maintaining vegetation cover that discourages burrowing <br /> ground squirrels, disking to destroy burrows, or control of ground squirrel populations <br /> 14. CITY OF STOCKTON MUNICIPAL UTILITIES DEPARTMENT (Staff Contact: Robert Castelli, <br /> 209-937-8750) <br /> • a. 81 (1.4) <br /> Proposed as Part of the Project: <br /> if leachate Is delivered to the City of Stockton Regional Wastewater Control Facility,the <br /> project sponsor will provide for independently corroborated test results to the City to <br /> demonstrate the chemical composition of the leachate extracted from the proposed <br /> consolidated landfill project. Monitoring and testing of landfill-generated leachate will meet <br /> the requirements of the City of Stockton Wastewater Ordinance and the City Municipal <br /> Utilities Department. <br /> If leachate quality is not acceptable for disposal at the Regional Wastewater Control Faculty, <br /> the project sponsor will either have the leachate collected and disposed off-site by a licensed <br /> Treatment and Disposal Facility,or will develop on-site leachate processing that will result in. <br /> treated leachate that is acceptable for disposal at the wastewater treatment plant or <br /> acceptable to regulatory agencies for on-site use. The design and operation of any on-site ' <br /> leachate processing that is Implemented will comply with all applicable laws and regulations. <br /> • San Joaquin Count _ _ <br /> County UP tl0 7, ER-00-27orward, Inc. <br /> Community Development Page 25 <br />