My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:27:23 PM
Creation date
7/3/2020 11:20:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_1
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. 64 Austin 2000(Fl.c) <br /> Restoration of the riparian area shall Include revegetation with trees,shnibs, and grasses <br /> native to the area. Plantings shall have a minimum 80%survival after the first year, and 900 <br /> %survival thereafter,or shall have attelned a 75%cover alter three years and a 90%cover <br /> after five years Plantings shall be monitored each year and maintained as necessary untfl <br /> success criteria have been met. In order to assure Implementation,the Wetlands Mitigation <br /> and Monitoring Plan shall be modified to Include these criteria. <br /> 13. SAN JOAQUIN COUNTY COUNCIL, OF GOERNMENTS (Staff Contact: Jerry Park, 209--468- <br /> 3913) <br /> a. 79 Austin 2000(F4.a)(updated) <br /> Expansion of the landfill into the[Austin Road]Expansion Area shall be preceded by a <br /> nesting survey for Swainson's hawks during the breeding season in order to document the <br /> presence, location and number of Swainson's hawks nests near or within the Landfill. These <br /> nests and other detected nests shall be monitored yearly to document the effect If any of the <br /> landfill operations on the presence of breeding Swainson's hawks and on the success of <br /> breeding Swainson's hawks <br /> b. 72 Austin 2000(F7:8) <br /> According to the SJMSCP,the miligabon fee for conversion of agricultural lands to other uses <br /> Is$1,500 per acre. For the conversion of 293.9 acres of Agricultural Lands, the County shall <br /> pay$320,850 to the SJMSCP Joint Powers Authority to fund acquisition of preserve lands for <br /> covered species that could potentially be affected. <br /> c. 73 Austin 2000(F94.a) <br /> • Pre-construction surveys for greater western mastiff bat should be conducted prior to <br /> removing any trees from the project site. These pre-construction surveys may be required <br /> and funded by the SJMSCP JPA and should be conducted by a biologist with experience <br /> surveying for bats, and the surveys should not occur any more than 30 days prior to the , <br /> proposed tree removal. If no special-status bats are identified during the pre-construction <br /> survey(s),then no Impacts to these bats would be expected to occur from construction of the <br /> proposed project: If,however,greater western mastiff bat Is Identified in any of the frees <br /> proposed for removal,reproductive status should be determined. <br /> d. 74 Austin 2000(F94.b) <br /> .(Greater western mastiff bat) Maternity styes should be avoided until bats finlsh rearing <br /> young. Prior to the bats finishing rearing their young,bat roostalmatemal`bat houses"should <br /> be placed within a protected area in the vicinity of the toostfnglmatemity sites ff possible. As <br /> soon as young are flying and foraging, the maternity sites should be sealed. Similarly, once <br /> bat houses are Installed in protected areas,bats should be evicted from thelrroost sites <br /> within the project construction zone(i.e.,should be evicted from the trees to be removed). <br /> Removal of roost sites should occur during dusk or evening after bats have left the sites <br /> unless otherwise approved ?hese measures are consistent with the SJMSCP. <br /> e. 75 Austin 2000(F94.c) <br /> (Greater western mastiff bat) Pre-construction surveys would prevent direct take of <br /> individuals or maternity sites No Immediate replacement of roosting habitat has been <br /> proposed. If a maternity roost or occupied roost is detected during pre-construction surveys, <br /> the SJMSCP JPA shall provide adequate replacement for loss of occupied habitat should be <br /> designed and Implemented with input from CDFG Implementation of these mitigation <br /> measures would reduce Impacts to levels considered less than significant. <br /> San Joaquin County UP-00-7,ER-00-27otwan3, inc. <br /> Community Development Page 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.