My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:27:23 PM
Creation date
7/3/2020 11:20:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_1
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward .Landfill Page 10 <br /> If fixture spills or accidents during waste transport indicate that changes should be made to <br /> waste transport haul routes to the landfill from major arterials,SR 4 or Highway 99, the San <br /> Joaquin County Public Works Department shall modify the haul routes as appropriate. <br /> 35 (E.4) <br /> Proposed as Part of the Project: <br /> Where required by State and Federal regulations,the landfill gas monitoring, gas control and <br /> collection system will be installed,extending to the new areas of the expanding landfill and <br /> operating in conformance with applicable regulations. <br /> The existing gas extraction system,or an equivalent system,will continue to operate. <br /> Regular gas monitoring will be conducted to prevent explosive or toxic gas accumulation in <br /> onsite buildings or beneath temporary buildings. The landfill operator will install an <br /> automatic combustible gas detection and a.Iarm system for structures at the site. <br /> The landfill operator will not construct or otherwise locate any structure in an area of known <br /> landfill gas build-up. <br /> All site personnel who work:in permanent structures will be trained to use and respond to the <br /> landfill gas monitoring and alarm system. <br /> Identified in This EIR: <br /> Landfill gas monitoring shall include volatile organic compounds in order to determine the <br /> amount of contaminant recovery,and the landfill gas control system will control potential <br /> exposure to on site personnel <br /> 36 (E.5) <br /> Identified in This EER: <br /> The landfill operator shall submit an updated post-closure permit application for WMU-A <br /> that presents plans to prohibit the expansion of the new landfill areas above WMU-A. The <br /> applicant filed a renewal of its hazardous waste permit for WMU A on October 31,2000 <br /> (Kleinfelder,2000)that presents the controls and monitoring of WMU-A. The applicant's <br /> JTD descnbes creating a wedge of landfill material north of WMU-A that would keep a <br /> buffer area around the WMU-A boundaries clear of new refuse and then start to build <br /> outward and upward. This plan must have the approval of the CIWMB and RWQCB. <br /> 37(E.6) <br /> Proposed as Part of the Project: <br /> The landfill operator will follow legally required daily or alternative cover practices' <br /> The landfill will continue to ban intact tires(which collect water and serve as a breeding <br /> ground for vectors)and large dead animal;from disposal at the landfill. <br /> Existing measures to discourage birds from the landfill will be continued. <br /> Appropriate landfill personnel will periodically monitor the landfill for the presence of <br /> vectors and take preventative actionwhere required,and Iandfill inspections«ill be <br /> documented in the landfill operations administrative file. <br /> 38 (E.7) <br />
The URL can be used to link to this page
Your browser does not support the video tag.