Laserfiche WebLink
Consolidated Fonvard Inc. Landfill Page 17 <br /> systems. As part of that plan,grading operations will be scheduled-to avoid the rainy season <br /> and beimplemented by interim engineering control measures. Before grading is stopped, <br /> slopes n-ilf be directed to cant'runoff to areas where erosion and sedimentation can be <br /> controlled. Truck beds will be hosed down to reduce soil spillage on paved roads and wind- <br /> bloNtn dust. Relocation of Littlejohns Creek could lessen the sedimentation potential to the <br /> creek. <br /> Completed cells will be stabilized by the planting and maintenance of drought-resistant <br /> grasses. This will inhibit wind and water erosion and maximize the fertility of the soil in <br /> order to facilitate'revegetation. <br /> Temporary plantings,geofabric drapes,and erosion-preventing diversions of surface water <br /> N,.-ill be constructed as appropriate on temporary slopes. <br /> Regular operational and post-closure monitoring of erosion control structures and plantings <br /> ,�Nill be done for a minimum of five years. <br /> 59 Forward 1993(B.5) <br /> Assessment of gro ndwater levels in monitoring wells shall be initiated within 24 hours <br /> folloi%ing an earthquake event having a Modified Afercalli intensity of V or greater at the <br /> landfill. This will allow the water level database to be adjusted or seismic variations. In the <br /> event that anomalous water level changes are noted, a series of water quality sampling and <br /> testing events shall be initiated by the applicant to coordination with the RWQCB to detect an <br /> changes in water quality that may signs subsurface adjustments in landfill cells. <br /> 60 Forward 1993(B.6) <br /> Benchmarks shall be established(these could utili_zze monitoring well top of casing <br /> elevations), which will allowfor determinations ofsettlement/consolidation offill materials <br /> in closed sections of the landfall on an annual basis and following significant seismic events <br /> (Modified Merealli Scale of Yor above). In the event that changes are noted, the cause <br /> should be determined as should the effect on leachate collection and recovery systems. <br /> Repair liners and LCRS as necessary. In addition, remedial grading should be accomplished <br /> to restore the original cap's function to repel water and direct surface runoff. <br /> H.BIOLOGICAL RESOURCES <br /> 61 (H.2) <br /> Identified in This EIR: <br /> Night lighting with sodium lamps with sharp cutoff angles shall be used to focus light in <br /> active landfall areas(target areas) and to avoid nighttime lighting of adjacent open.areas and <br /> trees. <br /> 62 (H.3) <br /> Proposed as Part of the Project: <br /> As a participant in the SJCMSCP,Forward will incorporate SJCMSCP guidelines developed <br /> to minimize effects of rodenticides to the garter snake, the brush rabbit and the Swainson's <br /> Hawk(Appendix A of the SJCMSCP). <br /> Identified in This EIR: <br />