Laserfiche WebLink
Consolidated Forward Landfill Project—Mitigation 1, ,ring and Reporting Program Checklist 37 <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> 48(F.5) Design for pre-loaded Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> settlement Timing:Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement flan Waste Discharge Requirements(WDRs) <br /> Future design of Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> vertical expansion Timing:Prior to submission of Landfill Timing:Prior to approval of Landfill <br /> Design Plans for vertical expansion Design Plans for vertical expansion <br /> Maintain extraction Responsibility:Landfill operator Responsibility:RWQCB <br /> wells Timing: Ongoing Timing:Annually <br /> CIWMB and RWQCB Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> review vertical Timing:Prior to submission of Landfill Timing:Prior to approval of Landfill <br /> expansion design Design Plans for vertical expansion Design PIans for vertical expansion <br /> 49(F.6) Sample off-site wells Responsibility:Landfill operator ResponsibiIi.ty:RWQCB <br /> to east Timing:Quarterly(same frequency Timing:Quarterly(same frequency <br /> as onsite wells) as onsite wells) <br /> Sample additional Responsibility:Landfill operator Responsibility:RWQCB <br /> off-site wells Timing:At least twice a year Timing:At least twice a year <br /> Extract/treat VOCs Responsibility:Landfall operator Responsibility:RWQCB <br /> in offsite plume Timing:Ongoing Timing:Quarterly <br /> 50(F.7) Infiltration of treated Responsibility:Landfill operator Responsibility:RWQCB <br /> groundwater Timing:Ongoing Timing:Quarterly <br /> 51 (1-.9) Replace groundwater Responsibility: Landfill oporator Responsibility: RWQ('B <br /> monitoring wells 'Timing: As required by RWQCB 'liming:As delerminctl by RWQCB <br /> 52 Austin 1994(K3.c),Austin 2000(K3.c) <br /> Timing of discharge of Responsibility:Landfill operator Responsibility:RWQCB <br /> detention pond Timing: Ongoing Timing:Annually <br /> 53 Austin 1994(KS.e),Austin 2000(K5.e) <br /> Salvage metallic discards Responsibility:Landfill operator Responsibility:San Joaquin County <br />