Laserfiche WebLink
Consolidated Forward Landfill ' 9 0 <br /> Project—Mitigation Monitoring and Reporting Program Checklist <br /> Page 38 <br /> Mitigation Measure Itnnle,"entationImplementation <br /> Monitorlrrg Confirmation <br /> Comments <br /> (AB 7760) Timing: Prior toal o <br /> apin•°v f Environmental Health Department <br /> Solid Waste Facilities Permit(SWFP) Timing: Prior to Approval of <br /> Solid Waste Facilities Permit(SWFp) <br /> Sd Forward 1993(0) <br /> Secondary containment Responsibility:Land1711 operator Responsibility:Sctn Joaquin County <br /> for diesel fuel Tinning: Secondary containment shall be Environmental Health Department <br /> shown on Improvement plan Timing: During monthly site visits <br /> G.SOILS AND GEOLOGY , <br /> 55(G.2)Alternative daily cover Responsibility:Landfill operator Responsibility:CIWMB <br /> •Timing: If and as needed Timing:If and as needed <br /> 56(G.3)Modify seismic design Responsibility:Landfill operator Responsibility:RWQCB and CIWMB <br /> if needed Letters from RWQCB and.CIWMB <br /> approving seismic designshall be Timing:Prior to issuance of <br /> Waste Discharge Requirements(WDRs) <br /> included with the Improvement PIan <br /> Monitor liner and Responsibility:Landfill operator Responsibility: RWQCB and CIWMB <br /> dr•uirtnugc xyxictn 'Tinting:As datermined by RWQCI3 '!'Riling: Annually <br /> and/or Ci WMB <br /> i7(G.4)Seismic design Responsibility Landfill Operator Responsibility:RWQCB and CIWMB <br /> Title 27 Turing:Letters fromRWQCB and CIWMB Timing:Prior to issuance of <br /> approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement plan and Solid Waste Facilities Permit(SVVTp) <br /> 8(G.5)Implement erosion Responsibility:Landfill operator' <br /> management plan Timing:Daily Responsibility:RWQCB <br /> Tinning:Annually <br /> Revegetate cornplefecl Re9ponsibility: Landfill operator <br /> cells 'I'ittting: I Ipon complotio of each cell Responsibility: <br /> esp nsibilitAnn: RWQCII <br /> ly <br /> l;rosiort courli•ols on <br /> Responsibility: L,andtlll operator Responsibility: RWQCI3 <br /> temporary slopes 'Timing:Upon construction of <br /> tTiming;Annually <br /> temporary slopes <br /> Monitoring of erosion Responsibility:Landfill operator Responsibility: RW <br /> control measures Timing:Daily,and for at least ty' QC13 <br /> Timing:Annually,for at least <br />