Laserfiche WebLink
7-2 <br /> maintained in the facility's records. Agricultural compostable materials handling operations <br /> maintain records for compostable material accepted from off-site. A report of quantities and <br /> types of waste received and product removed from the facility are provided to the LEA on a <br /> quarterly basis. <br /> 7.5 Load Check Program Records <br /> As part of the load check program, the number of load checks performed and loads rejected <br /> will be documented by facility personnel in accordance with 14 CCR, Section 17869(e). <br /> Records will be maintained at the RRF/Compost Facility office and are available upon <br /> req u est. <br /> 7.6 Article 7 Test Result Records <br /> All test results generated in compliance with 14 CCR, Chapter 3.1, Article 7, including but <br /> not limited to, metal concentrations, fecal coliform and Salmonella sp. densities, <br /> temperature measurements, moisture content of active compost, dates of windrow turning, <br /> and pathogen reduction methods, as applicable to the facility, will be recorded and <br /> maintained at the facility in accordance with 14 CCR, Section 17869(f). <br /> 7.7 Record of Serious Injuries <br /> Records pertaining to any serious injury to the public occurring on-site and any complaint of <br /> adverse health effects to the public attributed to compost operations will be maintained at <br /> the facility in accordance to 14 CCR, Section 17869(g). Serious injury is one that requires <br /> inpatient hospitalization for a period in excess of 24 hours or in which a member of the <br /> public and/or site personnel suffers a loss of any member of the body or suffers any degree <br /> of permanent disfigurement. <br /> 7.8 Training Records <br /> The facility retains a record of training and instruction, which is completed in accordance <br /> with 14 CCR, Section 17867.5. These records are maintained at the site as required by 14 <br /> CCR, Section 17869(h). <br /> ® Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - November 2014 <br /> z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\resi 2014\text\9-nov 2014 track changes\sec Tdoc <br />