My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:33 AM
Creation date
7/6/2020 1:21:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RrL.v..;F V <br /> IN- " 7 2020 <br /> PEI/RM 200_17 ---- ---— — — --------------- -- ------- — --- <br /> ALTH <br /> 10. SHEAR VALVE ,r, <br /> INSPECTION AND <br /> TESTING <br /> 10.1 General. Shear valves are also known as emergen- <br /> cy shutoff valves,crash valves or impact valves.They are <br /> located on the product lines and sometimes on the vapor <br /> lines inside each dispenser.They must be located at grade <br /> level and securely anchored to function as intended.They 1 � <br /> immediately block fuel or vapor flow if a dispenser is dis- 0 <br /> placed from its regular position or if a fire occurs inside <br /> the dispenser. <br /> NOTE Authorities having jurisdiction (AHJs) - <br /> may require shear valves to be inspected and <br /> tested regularly. Furthermore, if a dispenser <br /> is dislodged from its normal position on the �r <br /> island after being hit by a vehicle or after a <br /> drive-off occurs, the shear valve should be <br /> inspected and tested for proper operation. <br /> If product is dispensed using a submersible pump,a shear <br /> valve must be present on each product riser at the base of FIGURE 10-1. When activated by fire or <br /> the dispenser. impact, the shear valve closes and blocks <br /> fuel flow from the dispenser supply lines. The <br /> 10.2 Product Shear Valves. shear valve shown is in the closed position. <br /> 10.2.1 Purpose. The purpose of this test and <br /> 10.2.5 Test Procedure. <br /> inspection is to verify that the product shear valves <br /> are properly installed per manufacturer's specifica- 1.Inspect the product shear valve for proper instal- <br /> tion and verify that product will no longer flow lation and anchoring. The portion of the shear <br /> through a product shear valve that is in the closed valve located below the shear section must be <br /> position. rigidly anchored to the dispenser box frame or <br /> the concrete dispenser island using hardware <br /> 10.2.2 Description of Test. The product shear and materials specifically designed for this pur- <br /> valve is inspected for proper installation per the pose.If the shear valve is not properly anchored, <br /> manufacturer.The product shear valve arm is then close the shear valve,remove the dispenser from <br /> tripped to stop the flow of fuel into the dispenser. service and notify the appropriate person to have <br /> An attempt is made to pump product through the it repaired. <br /> nozzle with the shear valve in the closed position. <br /> 2.Trip the product shear valve. <br /> 10.2.3 Preparation. Barricade the entire dis- 3.Attempt to pump fuel through the nozzle into the <br /> penser that is to be inspected and tested so that no <br /> test can. <br /> customers will attempt to pump fuel.Open the dis- <br /> penser cover to access the inside of the dispenser. 4.Using the wrench,reset the product shear valve <br /> arm into the open position. <br /> 10.2.4 Test Equipment. Test equipment shall <br /> include: 5.Place the cover back on the dispenser and <br /> remove barricades. <br /> • 5-gallon metal test can; <br /> 11/16 -inch box wrench or properly sized 10.2.6 Pass/Fail Criteria. If a product shear <br /> wrench. valve meets all of the following criteria, it passes <br /> the test: <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.