Laserfiche WebLink
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at LIST Facilities <br /> 4.Reset the E-stop that was just tested. • all dispensing devices on all islands; <br /> S.Ensure that power has been reestablished to normal • all submersible pumps for all fuel grades that serve <br /> operating condition. dispensing devices; <br /> 6.Continue to test each E-stop switch at the entire facil- • all power, control and signal circuits associated with <br /> ity. the dispensing devices and the submersible pumps; <br /> 7.Once every E-stop switch has been tested for proper • all other non-intrinsically safe electrical equipment <br /> operation, ensure that power has been reestablished to in the classified areas surrounding fuel dispensing <br /> the entire facility and allow normal pumping opera- devices. <br /> tions to resume. <br /> If any one of the passing criteria noted above is not met, <br /> 11.7 Pass/Fall Criteria. If all E-stop switches/buttons then the E-stop switches/buttons fail the test. <br /> disconnect power to the following,the system passes the <br /> test: <br /> pei.org <br />