�� PEI/RP1200-17 <br /> Termination fittings must be sealed at all piping <br /> 5. PIPING SECONDARY terminations, and test fittings must be accessible to <br /> CONTAINMENT INTEGRITY perform the test. <br /> TESTING Check with the piping manufacturer regarding <br /> testing procedures and the proper pressure before <br /> 5.1 General. Underground product piping is available testing. Testing requirements stated in this recom- <br /> with single and double walls.Double-walled piping pro- mended practice are general statements and may <br /> vides containment for leaks from primary containment vary. Recommended pressure levels and test dura- <br /> and must be leak-free to prevent release of product into tions are addressed in Section 5.3.5. Piping manu- <br /> the environment. facturers'test procedures may differ. <br /> 5.2 Purpose. This method is used to test the integrity This test can be conducted in sections or as one <br /> of piping interstitial space(s). continuous pipe depending on the installation.Care <br /> should be taken to ensure that the entire secondary <br /> 5.3 Testing Piping Under Pressure. containment of the piping system is tested. <br /> 5.3.1 Description of Test. The interstitial space 5.3.4 Test Equipment. Test equipment shall <br /> is sealed at the ends and is pressurized with an inert include: <br /> gas. The pressure is monitored for 1 hour. If any . inert gas source(nitrogen,helium,etc.); <br /> pressure drop occurs, the secondary containment <br /> fails the test. • stopwatch or other time-measurement device <br /> capable of measuring a 1-second increment; <br /> 5.3.2 Test Conditions. The primary pipe may <br /> contain fuel, and dispensing activities may con- test tubing assemblies ('Tubing assemblies pro- <br /> vide access to the beginning and end of the <br /> tinue during the test without affecting test results. interstitial space.); <br /> 5.3.3 Preparation. If the interstitial space con- . pressure gauge with a 15 psig maximum pres- <br /> tains product, ensure that the interstice is open to sure reading with 0.5 increments. <br /> the atmosphere and perform a precision test on the <br /> primary piping before conducting a test on the sec- 5.3.5 Test Procedure. <br /> ondary containment piping. 1.If necessary,re-install termination(test)boots at <br /> piping terminations. <br /> 2.If necessary, connect the tubing assemblies to <br /> the secondary containment termination fitting <br /> f4��.:• on each end of the section of piping to be tested. <br /> 3.Connect the inert gas source and pressure gauge. <br /> 4.Gradually pressurize the interstitial space to 5 <br /> psig. Close the valve and allow the pressure to <br /> stabilize.Repressurize to the specified test pres- <br /> sure if necessary. <br /> 5.Observe the pressure for a period of 1 hour. <br /> 6.If the piping pressure after 1 hour is less than the <br /> test pressure,check termination fittings and test <br /> �.; assemblies for leaks. <br /> S 7.Release the pressure on the system slowly. <br /> S.Remove the test equipment. <br /> FIGURE 5-1. Boots on piping transitions and through 9.Restore the piping to its normal operating condi- <br /> sump walls must be leak-tight when piping secondary tion. <br /> containment integrity testing is performed. <br /> ® pei.org <br />