Laserfiche WebLink
Introduction and Instructions <br /> The hazardous waste contingency plan is an ESIM document that Target <br /> stores are required to have onsite by federal regulations. This document <br /> must be kept current, and this activity is to review the contingency plan <br /> to make sure that the information is current and correct. <br /> ❑ What you will need: <br /> • Hazardous Waste/ESIM Contingency Plan Discussion Guide <br /> • Emergency Log Binder <br /> • STL, ETL-LOG, and ETL-HR <br /> ❑ Use this Discussion Guide to lead the conversation between the STL, <br /> ETL-LOG, and ETL-HR. <br /> This guide includes information about: <br /> • What the Hazardous Waste/ESIM Contingency Plan is <br /> • How it differs from the Hazardous Materials Business Plan (CA <br /> Only) <br /> • The key players and their roles <br /> • Updating and verifying the Hazardous Materials/ESIM Contingency <br /> Plan <br /> • What do you fill out <br /> • Who gets a copy it <br /> • When does it get updated <br /> • How to retain the correct information and where to retain it <br /> • The layout and how to find the information you will need to know <br /> • Steps to implement the plan in an emergency <br />