My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0524706
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 10:41:12 AM
Creation date
7/7/2020 8:59:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524706
PE
2960
FACILITY_ID
FA0016587
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,4W N✓ �✓ <br /> '7 <br /> Port of Stockton <br /> 2201 W. Washington Street <br /> Stockton, California 95201 <br /> Attention: Mr. Richard W. Weitzenberg <br /> Gentlemen: <br /> Maintenance' and operation of Port of Stockton trackage and <br /> railroad facilities are being performed by the trunk carriers on <br /> an alternating -annual basis. While the rotation of operations <br /> has proven satisfactory, maintenance of the rail facilities does <br /> not lend itself to rotation because-of the- lack of continuity <br /> or the ability to' perform programmed maintenance. . 'It is thereL <br /> fore desirable that maintenance- be under the supervision of the . <br /> Port on a- continuous basis. - . -- <br /> In accordance with tentative agreements reached betty n <br /> representatives of the trunk line carriers and the Port. f Stockton, <br /> maintenance of Port track and other railroad facilitie will be <br /> assumed by the Port of Stockton and..performed. by . an oAside con- <br /> tractor obtained by the Port. Following are the agreed upon pro- <br /> cedures for maintenance of Port tracks: <br /> 'l. Port Engineer or other. desigr;ied officer will supervise <br /> maintenance of Port trackage and railroad facilities. <br /> An appropriate budget will be prepared each year prior <br /> to May 1 covering maintenance expenditures on Port <br /> trackage for the following fiscal year commencing July <br /> 1 and ending on June 30. This budget will be reviewed <br /> .-- 3 approved by the engineering committee of the trunk <br /> line carriers. The budget to include listing of mainten- <br /> ance items by project and estimated cost. <br /> 2. The Port will contract for items on the approved budget <br /> during the fiscal year without need for further authority <br /> from trunk line carriers. This will include furnishing <br /> initially one laborer on 'a full-time basis ,to handle the <br /> oiling of switches, weed control and miscellaneous day- <br /> to-day maintenance items. Items not on the approved <br /> budget or items bid at a price exceeding budget estimate <br /> will require specific authority from trunk lines engineer- <br /> ing committee before proceeding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.