My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:16:15 AM
Creation date
7/7/2020 9:10:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 6 <br /> Advanced <br /> GeoEnvironmentai , Inc . <br /> 12 August 2008 <br /> AGE-NC Project No. 01-0839 <br /> Ms. Lori Duncan <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> Stockton, California 95202 <br /> Subject: Interim Soil Remediation <br /> ERNIE'S GENERAL STORE <br /> 4407 East Waterloo Road, Stockton, California <br /> Dear Ms. Duncan: <br /> At the request of Mr.Emest P.Giannecchini ofErnie's General Store,AdvancedGeoEnvironmental, <br /> Inc. (AGE) has prepared this letter to present alternatives for installation of electrical power for <br /> operation of the approved soil vapor extraction system as a method of interim soil remediation for <br /> 4407 East Waterloo Road, Stockton, California(site). <br /> Power source options for the SVE system include: 1) installation of a transformer at the site by <br /> Pacific Gas & Electric; 2) upgrading the existing electrical panel to support the additional power <br /> needed; or 3)use of a diesel-powered generator. Below is a table presenting the three power source <br /> alternatives, the projected cost and time frame for the installation of each alternative. <br /> Total Estimated Costs <br /> Estimated Implementation <br /> Power Source Installation Costs (Power+ Installation) <br /> Operational Costs Time <br /> 6 Mos/ 12 Mos <br /> Approximately <br /> New Transformer $35,000(includes cost $3,000/month $53,000 /$71,000 90 to 150 days <br /> of running conduit to <br /> the SVE system). <br /> Approximately <br /> Upgrade Existing $15,000 (Includes cost $3,000/month $33,000/$51,000 30 to 60 days <br /> Electrical Panel of running conduit to <br /> the SVE system). <br /> $15,000/month <br /> Diesel-Powered Approximately$2,000 (includes $92,000/$182,000 30 days <br /> Generator generator and <br /> fuel) <br /> 837 Shaw Road_Stockton.Calituruia 9i2 t <br /> I'dlcphone (209)467 1006 l•'ax (209)-167 1 1 1 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.