My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:16:15 AM
Creation date
7/7/2020 9:10:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIROAT ENTAL HEALTH REPARTMENT <br /> )�Po�,N SAN JOAQUIN COUNTY <br /> '—af'tiiC�G <br /> Program Coordinators <br /> a � � Donna K. Heran, R.E.H.S. 304 East Weber Avenue,Third Floor Carl Borman, R.E.H.S. <br /> �,1 a Director g <br /> Laurie A.Corolla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> • c4' ,.,,P Assistant DirectorMargaret Lagorio, R.E.H.S. <br /> Telephone: (209)468-3420 Robert McClellon, R.E.H.S. <br /> Fax: (209)464-0138 Jeff Carruesco, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Kasey Foley,R.E.H.S. <br /> ERNEST P GIANNECCHINI <br /> ERNIE' S GENERAL STORE MAR 1 9 2007 <br /> 4407 E WATERLOO ROAD <br /> STOCKTON CA 95215 <br /> RE: Ernie's General Store SITE CODE: 0888 <br /> 4407 E Waterloo Road <br /> Stockton CA 95215 <br /> San Joaquin County Environmental Health Department (SJC/EHD) has reviewed <br /> Additional Site Assessment and Soil Vapor Extraction Pilot Test Report(Report) dated <br /> January 26, 2007, submitted on your behalf by Advanced GeoEnvironmental, Inc. (AGE) <br /> and has the following comments. <br /> The Report documents the installation of six soil vapor extraction (SVE)wells, two paired <br /> cone penetrometer test (CPT) borings, one groundwater monitoring well and the results <br /> of a soil vapor extraction pilot test. <br /> The groundwater monitoring well, MW-5, was installed to monitor the shallow <br /> groundwater down-gradient from the site. Initial analytical results were below reporting <br /> limits for all constituents analyzed. The CPT borings were installed to investigate the <br /> vertical extent of the groundwater contamination onsite. Grab groundwater samples <br /> were collected from three different depths; 88 feet, 95 feet and 115 feet below surface <br /> grade (bsg). Analytical results were below reporting limits for all constituents analyzed. <br /> The six SVE wells were installed in three clusters of two wells each, located to surround <br /> the underground storage tank (UST) area. The wells were built to two different depths; <br /> three wells are 30 feet deep and three wells are 60 feet deep. Separate SVE pilot tests <br /> were conducted on the different depth wells. The SVE test conducted on the deeper <br /> screened wells was aborted after one hour because the wells were unable to sustain a <br /> measurable flow rate. The SVE test conducted on the shallow wells was successful. <br /> The shallow wells sustained a good flow rate, vapor samples were collected for analysis <br /> and an effective radius of influence was measured at approximately 62 feet. All vapor <br /> samples reported significant concentrations of petroleum hydrocarbons, indicating SVE <br /> could be an effective remedial alternative for the soil contamination at this site. <br /> The Report recommends preparation of an Interim Remedial Action Work Plan to outline <br /> installation and operation of an SVE system at this site. SJC/EHD agrees with this <br /> recommendation. Please proceed with preparation of the proposed work plan and <br /> submit it to SJC/EHD no later than May 11, 2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.