Laserfiche WebLink
ENVIRONMENTAL HEALTH REPARTMENT <br /> PgUIN SAN JOAQUIN COUNTY <br /> so. o0 <br /> Q Donna K. Heran, R.E.H.S. Program Coordinators <br /> < Director 304 East Weber Avenue,Third Floor Carl Bergman, R.E.H.S. <br /> Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> CgCiFORN\P Assistant Director Telephone: (209)468-3420 Margaret Lagorio,R.E.H.S. <br /> Robert McClellan, R.E.H.S. <br /> Fax: (209)464-0138 Jeff Carruesco, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Kasey Foley, R.E.H.S. <br /> ERNEST P GIANNECCHINI AUG 16 2006 <br /> ERNIE' S GENERAL STORE <br /> 4407 E WATERLOO ROAD <br /> STOCKTON CA 95215 <br /> RE: Emie's General Store Site Code: #0888 <br /> 4407 E.Waterloo Road <br /> Stockton CA 95215 <br /> WORKPLAN: Additional Site Assessment and APPROVED: [X] <br /> SVE Pilot Test Work Plan Addendum <br /> DATED: August 7,2006 <br /> PREPARED BY: Advanced GeoEnvironmental,Inc. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10(c)(3)1: <br /> 1. Advancement of two cone penetrometer test borings for investigation of the vertical and lateral extent of the <br /> petroleum hydrocarbon contamination,in both soil and groundwater,at this site. Total depths of the borings are <br /> anticipated to be 100 and 150 feet bag. Sample depths will be dependent upon the lithology encountered. <br /> 2. Installation of one shallow groundwater monitoring well located offsite and downgradient to onsite well MW-4. <br /> 3. Installation of six soil vapor extraction(SVE)wells,three shallow(screen interval 15-30 feet bsg)and three lower <br /> (screen interval 45-60 feet bsg)in preparation for conducting two SVE pilot tests. One pilot test will be run on the <br /> shallow screened SVE wells,one on the lower screened SVE wells. <br /> COMMENTS AND CONDITIONS: <br /> 1. Please proceed with submittal of a San Joaquin County Well Permit Application,$89.00 permit fee and$285.00 <br /> permit processing fee for each parcel of land where work will be done. If mote than one C-57 licensed contractor <br /> will be conducting work,each will need their own permit. <br /> 2. Please proceed with scheduling the approved work. All fieldwork should be completed by October 20,2006. A <br /> report of findings must be submitted to SJC/EHD within 60 days following the completion of all fieldwork. <br /> 6. Forty-eight hours notification to SJC/EHD is required prior to all site fieldwork. <br /> l 1�0 L �',��, �� <br /> Lori Duncan,Senior REHS Nuel C.Henderson,Jr.,PG <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: James Barton,CVRWQCB <br /> Jo'1 Chapman,AGE <br />