My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:19 AM
Creation date
7/7/2020 9:11:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08 June 2010 <br /> AGE-NC Project No. 01-0839 <br /> Page 3 of 5 <br /> The soil-vapor samples will be analyzed by a California Department of Public Health (CDPH)- <br /> certified laboratory for: <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method TO-3; <br /> • Benzene,toluene,ethyl-benzene and total xylenes(BTEX compounds),methyl tertiary butyl <br /> ether (MTBE), tertiary amyl methyl ether (TAME), tertiary butyl alcohol TBA and 1,2- <br /> dichloroethane (1,2-DCA); and <br /> • Isopropyl alcohol(IPA)as a tracer gas in accordance with EPA Method TO-15. <br /> The proposed soil vapor boring locations are illustrated on Figure 2. Field procedures for <br /> advancement of borings and collection of soil vapor samples are presented in Section 3.1.Laboratory <br /> reports for soil vapor analyses, testing methods, laboratory QA/QC reports, and sample chain of <br /> custody documentation will be presented in a report with findings and recommendations. <br /> 2.3. REPORT PREPARATION <br /> Upon completion of field work and receipt of final laboratory analysis, a report of findings will be <br /> prepared presenting the findings of the investigation. The report will include a description of the <br /> work performed and results of the sampling and analysis and be signed by a California Professional <br /> Geologist. Conclusions, applicable recommendations, and maps will be included in the report. <br /> 3.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Professional Geologist. Soil vapor boring advancement and sampling procedures are described <br /> utilizing stainless steel canisters (Summa) and manifold assemblies. Leak testing, purge volume <br /> calculations,tracer gas application,purge,sampling and soil boring abandonment procedures are also <br /> described below. <br /> 3.1. SOIL-VAPOR BORING ADVANCEMENT <br /> Probe borings will be advanced using a van-mounted Geoprobe® 5400 direct-push probing unit <br /> equipped with 1.25-inch probing rods. <br /> Advanced GeoEnvironmen[al,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.