Laserfiche WebLink
i <br /> 14 <br /> December 2000 <br /> AGE-NC Project No 99-0559 <br /> Page 11 of 11 <br /> southwest of well MW-3 and north of well MW-1 <br /> Interim ground water remediation should proceed immediately to minimize the migration of the free- <br /> product and significant concentration of MTBE Due to the high mobility of MTBE, pump-and-treat <br /> should be initiated sufficient enough to capture ground water in the area of well MW-2 <br /> 7.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the geologic/hydro- <br /> geologic conditions at the site for the purpose of this investigation are made from a limited number <br /> of available data points (e g soil samples and ground water samples), and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional recommendations contained in this report <br /> I <br /> • <br /> i <br />